Combined Grid Solution
In October 2020, 50Hertz Transmission GmbH and Danish grid operator Energinet inaugurated the world’s first hybrid offshore interconnector, the Kriegers Flak Combined Grid Solution (KF - CGS). The CGS connects Germany and Denmark to each other via an interconnector which is also linked to several wind farms in the Baltic Sea. As a result, the interconnector can transmit offshore wind power to either country and can also be used for cross-border electricity trading.